What to Look for in a Kitchen Contract Before the First Cabinet Is Ordered

What to Look for in a Kitchen Contract Before the First Cabinet Is Ordered

In the last article, I walked you through why kitchen remodels generate so many expensive surprises after demolition. The electrical that is undersized. The plumbing that is corroded. The subfloor that is rotting. The wall that is load-bearing.

All of those are real problems. All of them cost real money. And all of them are much harder to deal with once the demolition crew has already started swinging hammers.

But here is what I want you to understand: the best time to prevent kitchen surprises is before the first cabinet is ordered. Not after demolition. Not during construction. Before. And the tool that does the preventing is the contract itself.

A kitchen contract is not a formality. It is the single most important document you will sign for your remodel. It dictates what you get, what you pay, and what happens when something goes wrong. A complete contract protects you. An incomplete contract protects the contractor.

I have reviewed dozens of kitchen contracts over the years. Here is what I look for before I recommend a homeowner sign anything.


Why Kitchen Contracts Are Different from Bathroom or Foundation Contracts

Complete countertop specifications with seam layout.

Kitchen contracts are more complex than bathroom or foundation contracts because they involve more trades, more materials, and more sequencing.

A bathroom remodel is relatively contained. A foundation repair is specialized. But a kitchen remodel touches everything: plumbing, electrical, gas, HVAC, structural, cabinetry, countertops, flooring, painting. Each one of those is a subcontractor. Each one has its own scope. And each one has its own potential for cost overruns.

A good kitchen contract does not just list the work. It coordinates the work. It tells you who is doing what, when they are doing it, and how they are going to do it together. And it puts all of that in writing before you order a single cabinet.

If your contract does not do that, you are not buying a remodel. You are buying a series of surprises.


The Cabinet Section: Where Most Contracts Are Vague

Cabinets are the largest single line item in most kitchen remodels, and they are also the section where contracts are most often incomplete.

Here is what I look for in the cabinet section of a kitchen contract:

1. Brand and Series

"Custom cabinets" is not enough. "Semi-custom" is not enough. The contract must specify:

  • The manufacturer (e.g., KraftMaid, Wellborn, Schuler, or a local custom shop)

  • The product line or series

  • The door style and wood species

  • The finish or paint color (with a manufacturer code)

I have seen contracts where the homeowner chose a specific door style during the sales presentation, but the contract simply said "white shaker cabinets." When the cabinets arrived, they were a different product line—lower quality, different construction, and a noticeably different shade of white.

What to look for: A written description that matches your selection sheet. If the contract does not reference your selection sheet, your selection is not part of the contract.

2. Construction Details

The contract should specify:

  • Cabinet box material (plywood vs. particleboard)

  • Dovetail or dado joinery on drawers

  • Soft-close hinges and drawer slides (brand and type)

  • Adjustable shelves (how many, and are they included?)

A complete contract includes all of this. A vague contract says "custom cabinets" and leaves the details to the manufacturer. The difference in quality can be thousands of dollars.

3. Scope of Installation

Cabinet installation is not just "hang the boxes." A complete scope specifies:

  • Who is responsible for shimming and leveling

  • Who is responsible for scribing to uneven walls

  • Who is responsible for cutting around plumbing or electrical

  • Who connects the cabinets to the wall and what fastener system is used

  • Who installs the crown molding and trim

  • Who installs the hardware

If the contract says "cabinet installation included," that is not enough. Ask what is included. And get the answer in writing.

4. Delivery and Storage

Kitchen cabinets are expensive and can be damaged by moisture or rough handling. The contract should specify:

  • When the cabinets will be delivered

  • Who is responsible for unloading and moving them into the home

  • Where they will be stored during the remodel

  • Who is responsible for inspecting them upon delivery (and what happens if they are damaged)

I have seen cabinets delivered on a rainy day and left in the driveway because the contractor was not on site. The homeowner was the one who had to file the damage claim.


The Countertop Section: Specifications Matter

Appliance specifications and hookup details in contract.

Countertops are the second largest line item, and they are often treated in the contract as an afterthought. Here is what a complete countertop scope includes:

1. Material Specifications

"Granite countertops" is not enough. The contract must specify:

  • The exact stone or material

  • The color and pattern (with a manufacturer name and code)

  • The thickness (typically 2cm or 3cm)

  • The finish (polished, honed, leathered)

  • The edge profile (e.g., eased, beveled, bullnose, ogee)

2. Seams and Layout

The contract should include a template or diagram showing where seams will be placed. It should also specify:

  • The maximum seam width

  • The seam adhesive (color-matched or clear)

  • Whether the seam is polished on site

3. Backsplash and Sink Integration

A complete scope specifies:

  • Who supplies the sink (you or the contractor)

  • Who is responsible for cutting the sink opening

  • Whether the sink is under-mounted or drop-in

  • The backsplash material, height, and scope

4. Removal and Disposal

Who removes the old countertops? Where do they go? Who pays for disposal? If the contract is silent, you are paying for it.


The Appliance Section: Who Supplies What?

Appliances are another area where contracts get vague. Here is what I look for:

1. Specifications

The contract should list:

  • The make and model of each appliance

  • The color or finish

  • Who is responsible for supplying them (you or the contractor)

  • Who is responsible for delivery

  • Who is responsible for installation and hookup

2. Hookups and Connections

The contract must specify:

  • Who runs the gas line to the range (if applicable)

  • Who runs the electrical circuit for the range and microwave

  • Who connects the dishwasher to the drain and water supply

  • Who vents the range hood to the exterior

  • Who disconnects and removes the old appliances

3. Delivery Timing

When will the appliances be delivered? If they arrive before the kitchen is ready, where will they be stored? If they arrive after the cabinets are installed, who is responsible for scheduling the installation?


The Unknown Unknowns: Unforeseen Conditions

No contract can predict every problem. But a good contract tells you how problems will be handled when they are discovered. Here is what I look for:

1. A Pre-Demolition Discovery Clause

Some contractors offer a pre-demolition discovery period—a few hours with a plumber, an electrician, and a structural specialist who can look behind access panels and open small sections of wall to identify hidden issues before demolition begins.

A contract that includes this is a contract that wants to reduce surprises. A contract that does not include it is a contract that plans to charge you for every surprise as it appears.

2. A Change Order Process

The contract must specify:

  • How change orders are requested (written notice required)

  • How they are priced (time and materials, or a fixed fee?)

  • Who approves them (you, and only you)

  • Whether there is a cap on change orders (some contracts have an "allowance" for unforeseen conditions)

3. A Material Selection Deadline

If you are responsible for selecting materials (tile, flooring, paint, hardware), the contract must specify when those selections must be made. If you miss the deadline, the contractor may proceed with their own selections—and charge you for the cost difference.


The Contractor Section: Who Is Actually Doing the Work?

Unforeseen conditions and change order contract clause.

Your contract should state exactly who is performing the work. Here is what I look for:

1. General Contractor vs. Subcontractors

If the contract is with a general contractor, the contract must specify:

  • Which trades will be subcontracted

  • Who the subcontractors are (by name, not just "licensed and insured")

  • Whether the general contractor is supervising the subs or just coordinating them

2. License and Insurance Verification

The contract must include:

  • The contractor's license number and issuing state

  • Proof of general liability insurance and workers' compensation insurance

  • The policy numbers and expiration dates

If the contractor says "I have insurance" but does not include the policy number in the contract, you have no proof. And if something goes wrong, you will not be able to file a claim.

3. Warranty

A complete contract includes:

  • A warranty on the workmanship (typically one year)

  • A warranty on the materials (pass-through from the manufacturer)

  • Contact information for warranty claims

  • What happens if the contractor is no longer in business


The Timeline: What Happens When Things Go Wrong?

A kitchen remodel should have a timeline. Here is what a complete timeline includes:

  • Start date: The day demolition begins

  • Milestone dates: Rough-in inspections, cabinet delivery, countertop templating

  • Completion date: The day the final inspection is passed and you can use the kitchen

  • Liquidated damages: What happens if the contractor misses the completion date (usually a daily credit to you)

If the contract does not include liquidated damages, the contractor can delay with no financial consequence. And you are the one living without a kitchen.


My Rule for Older Homeowners

Before you order a single cabinet, sit down with your kitchen contract and go through this list. Ask yourself three questions:

  1. Does this contract tell me exactly what I am getting—cabinets, countertops, appliances, and every trade?

  2. Does this contract tell me what happens when something unexpected is discovered?

  3. Does this contract tell me who is doing the work and who is responsible for the result?

If the answer to any of these is no, do not sign. A complete contract is not a luxury. It is a necessity. And it is the best tool you have to prevent a kitchen remodel from becoming a series of expensive surprises.

Ready to talk about your own home?

Book a free site visit — our designer will give you advice based on your actual space.

Book a Free Site Visit